Parking Structures

Based on the findings of the parking feasibility study, Parking Structure I (# 101), as identified on the campus Master Plan, is sited for the Northwest quadrant of the campus, East of Parking Lot L and the new access road.  Parking Structure II (# 102) is sited Northwest of the Coussoulis Arena and South of the proposed perimeter road.  Parking Structure I will contain 740 spaces and Parking Structure will contain 748 spaces for a total of 1, 488 new spaces.  The design proposes each structure to be 3-levels with 4 bays with a shear wall seismic system.  The buildings are designed to be cast-in-place concrete and other masonry materials for strength, durability, and minimal maintenance.  The buildings are recessed into the slope of the site to reduce the impact of strong seasonal winds and to preserve the mountain views.

Parking Stucture Image
   

Project Status: COMPLETE!

 

Construction Start: January 2007

Tentative Completion: March 2008

Project Architect:
Watry Design, Inc.

Project Contractor:

Bomel Construction Co., Inc.  

Project Manager: 
Frank Henderson

 

 

 


To view or print the documents you must have Adobe Acrobat Reader loaded on your computer. If you prefer, you may request copies from our main office at (909) 537-5136.
Get Adobe Acrobat Viewer