Skip navigation

About CPDC Mission Statement Staff Directory Directions Job Openings
Information Campus Accessibility Guide (7.8MB PDF) Campus Information Disruption Plan Links Presentations Site Map
Projects Projects
Contact Us Contact Information Suggestion Box
Home Pages CPDC Home CSUSB Home
CSU San Bernardino, Capital Planning, Design & Construction

Palm Desert Health Sciences Building

Artist's drawing of the completed Palm Desert Health Sciences Building

The third building developed on the Palm Desert Campus will respond to the critical need for health care professionals in the area. It will consist of 15,429 ASF/23,737 GSF of new classroom and lab space with the curriculum focus on the nursing program and related science courses. It will provide 140 FTE lecture and 37 FTE upper division lab capacity, including two computer labs with one specially equipped for distance learning. The project will also include 2000 ASF for information resources and library functions. In addition, it will provide the appropriate facilites to provide the functions of the Student Health Center in order to meet the health services needs of the students.

Project Status:  COMPLETE!

Construction Start: April 2007
Completion: October 2008

Project Architect:
HMC Architects

CM at Risk Contractor:
Swinerton Builders

Project Manager:
Hamid Azhand

To view or print the documents you must have Adobe Acrobat Reader loaded on your computer. If you prefer, you may request copies from our main office at (909) 537-5136.
Get the Adobe Acrobat Viewer

CSU San Bernardino
Capital Planning, Design, and Construction
5500 University Parkway, FM-102
San Bernardino, California 92407
Phone: (909) 537-5136   fax: (909) 537-5989
Monday through Friday 8:00a.m. to 5:00p.m.

Last Updated: